Project: Madison High School

Scope: 30,000 SF roof abatement, 54,000 SF flooring abatement, pipe insulation abatement throughout, 9,000 SF concrete slab demo.

Description: Madison High School was one of the three schools that got approved to be remodeled and rebuilt through a bond in 2017. During the rebuilt and remodel we did a large scope of 30,000 SF of roofing abatement, 54,000 SF flooring, pipe insulation throughout, and 9,000 SF of concrete slab demo.