Project: Henry Building

Scope: Selective demolition of all flooring levels 2-6, all kitchens, all ceilings, interior walls throughout, plumbing fixtures, HVAC duct work.

Description: This historic building that was built in 1909 in downtown Portland, since then it has been remodeled and modified to keep it on its feet. During one of the modifications we did some selective demolition of all the floors levels 2-6, which included all the kitchens, plumbing fixtures, ceilings, interior walls throughout, and HVAC duct work.